Aldbridge Street Goods Station

The Build a Better Railway  

Project

wp33e862e6.png



Other Rolling Stock

wp530c2e6d_0f.jpg

It is hoped to show a samples of the rolling stock as it gets built for use on the layout. All will be fitted with three link couplings as standard. The rolling stock will be a combination of converted ready to run stock and kit built stock. Three link couplings will be fitted to all rolling stock as standard.